Teleoperation rig for field data
Custom harnessing, hot-swappable compute, and a capture pipeline that matched the client’s labeling schema on day one of pilot units.
Prototype to 200 units in 14 weeksThese summaries focus on the decision that moved yield, cost, or reliability. Client names are omitted where NDAs require it.
Shielding, stack-up, and test fixture changes that took a pilot build from 62% first-pass to 94% without a full architecture rewrite.
Custom harnessing, hot-swappable compute, and a capture pipeline that matched the client’s labeling schema on day one of pilot units.
Prototype to 200 units in 14 weeksGate location, rib layout, and material switch documented with mold trials so the client could sign PPAP with measured Cpk data.
Tooling revision in 3 weeksAlternate BOM, firmware pin migration, and a regression suite tied to the same fixtures the factory already owned.
Zero line downtime at cutoverTraceability on calibration, sealed optics stack, and factory tests mirrored in the client’s incoming inspection checklist.
First article accepted on second buildNeed detail under NDA? We can walk through timelines, revision tables, and test evidence on a call once an MNDA is in place.